uh...

shade+water: cambodian elementary school

›
The project began with the simple observation that where there is shade, there are children playing, and where ther...

MC hits southeast asia

›
this summer, i've been traveling across southeast asia through the USC school of architecture summer asia study abroad trip. the trip is...

echo park school of performing arts: phase 5

›
the final couple weeks of the project involved a final passthrough of design work on our designs before beginning final production to cap...

echo park school of performing arts: phase 4

›
in this phase of the project, we constructed two large models to begin to understand the structural systems and details of our designs. thes...

echo park school of performing arts: phase 3

›
in the schematic design phase of this project, we took one of the design schemes from phase 2 and further developed it, interrogating indivi...

echo park school of performing arts: phase 2

›
after initial analysis of the site, we were to conduct programmatic studies and early formal development for the school, resulting in 3 sepa...

the urban kitchen

›
in 2008, la city council approved a year long ban upon new fast food restaurants being built in south la. while intentions were good, the ...
›
Home
View web version

About Me

mike cochran
View my complete profile
Powered by Blogger.