uh...
shade+water: cambodian elementary school
›
The project began with the simple observation that where there is shade, there are children playing, and where ther...
MC hits southeast asia
›
this summer, i've been traveling across southeast asia through the USC school of architecture summer asia study abroad trip. the trip is...
echo park school of performing arts: phase 5
›
the final couple weeks of the project involved a final passthrough of design work on our designs before beginning final production to cap...
echo park school of performing arts: phase 4
›
in this phase of the project, we constructed two large models to begin to understand the structural systems and details of our designs. thes...
echo park school of performing arts: phase 3
›
in the schematic design phase of this project, we took one of the design schemes from phase 2 and further developed it, interrogating indivi...
echo park school of performing arts: phase 2
›
after initial analysis of the site, we were to conduct programmatic studies and early formal development for the school, resulting in 3 sepa...
the urban kitchen
›
in 2008, la city council approved a year long ban upon new fast food restaurants being built in south la. while intentions were good, the ...
›
Home
View web version